Relocation of the state road II/583 – Žilina (2012)

Design and construction of the realignment of Road II/583 in the section from the bridge over the Váh River to the connection to the original route beyond the village of Gbeľany near Žilina. The realignment provided a high-capacity and direct road connection of the Kia Motors Slovakia and Mobis Slovakia manufacturing plants to the road network of the Slovak Republic.

The project also included complete drainage of the roadway by means of road drainage systems and the installation of public lighting in sections adjacent to the manufacturing sites.